Aspire issue_10 Cover

FULL ISSUE

ASPIRE Spring 09 15.5 MB PDF FILE

FEATURES

PBS&J Standardizing Success 669.9 KB PDF FILE

PBS&J creates innovative solutions by focusing on efficiency, constructability, and long life.

I-76 Allegheny River Bridge 612.6 KB PDF FILE

New Pennsylvania Turnpike Bridge balances aesthetics, economy, and environmental sensitivity.

Forty Foot Pedestrian Bridge 3.2 MB PDF FILE

Integrating Art and Engineering in Public Infrastructure.

Richmond Hill Bridge 1.0 MB PDF FILE

Constant-depth bottom flanges on precast concrete U-girders were converted to a variable depth at the site to reduce fabrication and transportation costs.

Minnesota I-35W/Hwy 62 Crosstown Project 2.8 MB PDF FILE

Precast segmental construction offered the most advantages and was the most attractive option.

Fulton Road Bridge Replacement 577.1 KB PDF FILE

Cotton Lane Bridge 2.1 MB PDF FILE

Combination of local government and developers produces decorative, cost-efficient bridge design.

DEPARTMENTS

Editorial 366.5 KB PDF FILE
Reader Response 781.8 KB PDF FILE
Concrete Calendar 428.8 KB PDF FILE
Perspective 560.7 KB PDF FILE

Sustainability Get In, Get Out, and Stay Out

Aesthetics Commentary 2.8 MB PDF FILE
Safety and Serviceability 379.2 KB PDF FILE
Concrete Connections 272.6 KB PDF FILE
COUNTY - Lee County, Florida 448.1 KB PDF FILE
AASHTO LRFD Specifications 157.2 KB PDF FILE